Bid desk for data center subcontractors

Say yes to more data center bids.

We read every invitation within a day and do everything around the number. You set the price.

Free. By email within one working day. NDA on request.

Detail 1 · Power path, data hallReview in progress
UTILITY 13.8 kV MV SWITCHGEAR XFMR 2500 kVA MAIN SWBD 480V G GEN 2 MW UPS A PDU RACKS ADD. 2: UPS ROOM MOVED RFI: FUEL SCOPE, DIV 23 OR 26? LONG LEAD: SWBD 38 WKS REVIEWEDGO · 3 RFIs · 9 DAYS
DrawingOur review notesIllustration, not a real project
What changes

Twelve invitations on Monday. A clear call on each by Tuesday.

Tuesday 08:00 · Reviewed5 GO · 7 NO-BID
Data hall fit-out, Northern VirginiaGOfits crews, 9 days
Substation upgrade, SloughGOstrong margin
UPS room retrofit, DallasNO-BIDdue in 2 days
Chiller plant, PhoenixNO-BIDnot your trade
Colocation phase 2, ColumbusGOrepeat GC
Hospital MEP package, LeedsNO-BIDover bonding limit
Generator yard, RenoGOfits schedule
Office tower lighting, AtlantaNO-BIDlow margin
Edge sites rollout, TexasGO6 sites, one scope
Cable tray package, ChicagoNO-BIDdesign incomplete
School refurbishment, OhioNO-BIDout of region
Battery room, London DocklandsNO-BIDgear lead time risk
Every call with a reasonIllustration
How it works

You keep the number. We do the rest.

You

Forward invitations

As they arrive, by email or from any portal.

Bidbacker

We review in a day

Go or no-go, with the reason.

Bidbacker

We prepare the bid

Scope, quantities, supplier quotes, deadlines, prequal forms.

You

You price and submit

Your number, under your company.

Free review

Try it on one invitation.

Attach the documents of one invitation you have now. The review arrives by email within one working day.

  • Go or no-go, with reasons
  • Scope for your trade, section by section
  • Gaps and risks, worded as RFIs
Send an invitation →
SAMPLE REVIEW · PUBLIC BID, CLOSED 25 NOV 2025Data center UPS replacements, Montana State UniversityDiv 26 Electrical · base bid + 1 alternate
GO
Call
Bid, if registered in Montana and the UPS can arrive before the summer outage window.
Scope
Remove old UPS units, install a 45 kW UPS, re-feed panels, rewire the EPO. Second UPS is the alternate.
Addenda
1 reviewed. Adds EPO rewiring to the base bid, outage notice becomes 2 weeks.
Risks
Outages only in academic breaks. Asbestos in the raised floor tile.
RFIs
9 drafted, including how the $150,000 bid bond threshold is measured.
READ THE FULL REVIEW →
$85B

a year: pace of US private data center construction, up 73% in a year

US Census Bureau, Aug 2026 ↗
$112K

a year: average salary of an electrical estimator, before data center premiums

Glassdoor ↗
1 day

to a go or no-go call on every invitation you forward

General contractor? We find qualified subcontractors for a package and collect at least three prices.

Ask about coverage
FAQ
Do you set our prices?

No. We prepare the review, scope, quantities and package. You set the price and submit under your company.

Who does the quantity takeoffs?

Takeoffs are not part of the free review. When your bid needs them, an experienced estimator we bring in for your job does the count, and we check it before anything reaches you.

Is our information kept confidential?

Yes. Your bids, prices and documents are used only for your work, and we sign an NDA on request.

How much does it cost?

A monthly fee that depends on how many invitations you want worked. We share pricing after the free review.